TELKOMNIKA Telecommunication, Computing, Electronics and Control
Potentials of solar power plant in Waru Tua
Dublin Core
Title
TELKOMNIKA Telecommunication, Computing, Electronics and Control
Potentials of solar power plant in Waru Tua
Potentials of solar power plant in Waru Tua
Subject
MATLAB, Solar cell, Solar power plant, Waru Tua
Description
Penajam Paser Utara Regency is located on the coast of East Kalimantan
Province. This regency has a huge solar resource potential, but the agreement in this regency still lacks electricity networks and can be resolved by the people in this regency still in dire need of electricity for street lighting, and daily electricity needs. One of them is in the village of Waru Tua, where this area is in great need of lighting in the dock area because it requires residents to make A living as a fisherman. Waru Tua really needs electricity for lighting at night Waru Tua Pier because it has to be a gathering place for residents before going to sea to prepare everything that must be prepared before going to sea. Discussing the research carried out examining the potential of solar power in Waru Tua. Based on existing considerations, and the potential proposed by the area, the method used is to measure the sunlight at Waru Tua Pier using Lux meter, then the data is processed using the Simulink application in MATLAB to obtain the value of the amount of sunlight in the area, which
is 16 KW with a total solar cell of 250 Wp.
Province. This regency has a huge solar resource potential, but the agreement in this regency still lacks electricity networks and can be resolved by the people in this regency still in dire need of electricity for street lighting, and daily electricity needs. One of them is in the village of Waru Tua, where this area is in great need of lighting in the dock area because it requires residents to make A living as a fisherman. Waru Tua really needs electricity for lighting at night Waru Tua Pier because it has to be a gathering place for residents before going to sea to prepare everything that must be prepared before going to sea. Discussing the research carried out examining the potential of solar power in Waru Tua. Based on existing considerations, and the potential proposed by the area, the method used is to measure the sunlight at Waru Tua Pier using Lux meter, then the data is processed using the Simulink application in MATLAB to obtain the value of the amount of sunlight in the area, which
is 16 KW with a total solar cell of 250 Wp.
Creator
Ain Sahara, Riza Hadi Saputra, A. M Miftahul Huda
Source
DOI: 10.12928/TELKOMNIKA.v18i6.15763
Publisher
Universitas Ahmad Dahlan
Date
October 2020
Contributor
Sri Wahyuni
Rights
ISSN: 1693-6930
Relation
http://journal.uad.ac.id/index.php/TELKOMNIKA
Format
PDF
Language
English
Type
Text
Coverage
TELKOMNIKA Telecommunication, Computing, Electronics and Control
Files
Collection
Citation
Ain Sahara, Riza Hadi Saputra, A. M Miftahul Huda, “TELKOMNIKA Telecommunication, Computing, Electronics and Control
Potentials of solar power plant in Waru Tua,” Repository Horizon University Indonesia, accessed November 14, 2024, https://repository.horizon.ac.id/items/show/4163.
Potentials of solar power plant in Waru Tua,” Repository Horizon University Indonesia, accessed November 14, 2024, https://repository.horizon.ac.id/items/show/4163.